(Above) Kai Staats installs simulated pathways for Mars gypsum deposits—nylon rope pinned to foam blocks to be covered by shotcrete and then hand painted, perhaps encrusted with real minerals embedded in an epoxy resin in a later phase.
The sculptors completed their work in foam, applying final textures and geological interfaces while SAM team member Matthias applied expanded steel and mesh to the K-Rock feature, reinforcing the areas on which SAM crew members might walk while on EVA. The existing concrete slab was covered by rose paper before Demian of Red Hen sprayed the blue Weldcrete adhesive, providing a chemical adhesion layer between the foam and shotcrete.